What You Can Legitimately Leave Out: Omission Grounds and Phase-In Reliefs in the Revised ESRS

The revised ESRS cut mandatory datapoints by more than 60%, but the quieter change is how much room preparers now have to leave things out. Used well, the reliefs save real effort. Used carelessly, they become assurance findings. This guide separates what the standard lets you omit from what it only lets you delay.
Two different kinds of relief
It helps to keep two mechanisms apart. An omission ground lets you leave information out because a specific condition applies. A phase-in relief lets you skip a disclosure for a set number of years, after which it becomes mandatory. Treating one like the other is the most common planning error.
New omission grounds
According to Sami's summary of the revised ESRS, the new grounds for omitting information include serious commercial harm, intellectual capital or technological information, and classified information. The company must flag each omission rather than drop the content silently.
An omission is a disclosed decision, not a quiet deletion. If a datapoint is missing without a flag, expect your assurance provider to treat it as an error.
In practice that means building a short omissions register: the datapoint, the ground relied on, who approved it, and the evidence for it. "Serious commercial harm" in particular needs a reasoned case, not a general preference for confidentiality.
Phase-in reliefs for anticipated financial effects
The sharpest relief covers anticipated financial effects. Per the same source:
| Reporter | Quantitative information may be omitted | Anticipated financial effects may be omitted |
|---|---|---|
| Wave 1 companies | Until 2030 | For financial years before 2028 |
| Other companies | For the first four reporting years | For the first two reporting years |
These are delays. The disclosure comes back, so the data work has to start inside the relief window, not after it.
Other flexibility worth knowing
- Undue cost or effort. The revised standards add an undue cost or effort clause, greater use of estimates, and relief for newly acquired businesses according to CoreFiling. Our value chain data guide covers the proportionality test in detail.
- Top-down materiality. Double materiality can start from the business model and be combined with bottom-up analysis, which reduces documentation load.
- Voluntary datapoints are gone. All of them were removed, so there is nothing optional left to trim.
A documentation checklist
- List every datapoint you plan to omit or phase in, and the exact ground for each.
- Record who signed off and when, and keep the supporting analysis.
- Set a calendar reminder for the year each phase-in expires.
- Keep collecting a rough version of the data during the relief window, so the first full disclosure is not a scramble.
- Align the wording in the sustainability statement with the register, so flagged omissions and the register match.
Can I omit a datapoint because it is commercially sensitive?
Only if serious commercial harm applies, and you must flag the omission. General sensitivity is not enough.
Do phase-in reliefs apply to every company the same way?
No. Wave 1 companies can omit anticipated financial effects for financial years before 2028 and quantitative information until 2030. Other companies get two reporting years and four reporting years respectively.
Do the reliefs remove the need for materiality assessment?
No. Double materiality remains. The reliefs change what you must disclose once a topic is material, not whether you assess it.
Will assurance providers accept omissions?
They will test whether the ground is genuine and flagged. A register with evidence makes that conversation much easier.
Related reading
Can a Wave 1 Company Stop CSRD Reporting? The Below-Threshold Exit, Step by Step
Omnibus I lets Wave 1 companies that fall below the new thresholds stop mandatory reporting once their Member State transposes Directive 2026/470. Here is how to test whether you qualify and what to do in the meantime.
ISSA 5000 With an EU Twist: What the CEAOB Advice Means for Your Limited Assurance Engagement
The Commission asked auditors' oversight bodies for advice on EU-specific changes to ISSA 5000, with a delegated act on limited assurance standards due by 1 July 2027. What to expect and how to prepare.
The EU Voluntary Standard Is Now in Force: What Regulation 2026/1560 Means for Companies Still Using VSME
The Commission's Voluntary Standard entered into force on 24 September 2026 and replaces VSME as the EU reference for smaller companies. Here is what changed, who it is for, and how to migrate without redoing your data work.